One of the largest production blocks in classical power industry is being developed in Ledvice Power Plant of ČEZ, a.s. The steam-gas turbine will have an output of 660 MW. Within this project S U M O s.r.o. realized the following: 

  • Assembly of cable routes; 
  • Laying of cabling including its connection; 
  • Assembly of field instrumentation.